Case study · In progress

Carolina Park car dealership development

A car dealership development currently underway in Carolina Park, Mount Pleasant. GDI is flying and processing this site end to end, from flight planning through orthomosaic, surface model, and a full Site Intelligence Report, as a working demonstration of a recurring documentation program.

Project record

Site
Carolina Park, Mount Pleasant, SC
Use
Car dealership development
Capture
Grid mission, nadir imagery at 197 ft, 75% front and side overlap
Area
9.45 acres per flight
Images
240 per flight
Resolution
1.7 cm (0.7 in) per pixel
Latest flight
07/03/2026
Outputs
Orthomosaic, point cloud, surface model, KMZ overlay, sample Site Intelligence Report
Status
In process
Orthomosaic of the Carolina Park dealership site on 07/03/2026, showing the building slab, graded pad, and staging areas, with north arrow and 50 m scale bar
Orthomosaic, 07/03/2026
Surface change heatmap of the graded building pad, 03/14/2026 to 05/03/2026. Warm tones show surface rise (fill), cool tones show lowering (cut), on a scale of minus 2 to plus 2 feet
Surface change, 03/14 to 05/03/2026
Oblique aerial photo of the dealership slab and foundation walls with the surrounding pine buffer
Oblique aerial, slab and foundation walls
Time-lapse

Watch the site take shape.

Every flight follows the same plan, so the captures line up into one continuous time-lapse of the site.

What this shows a GC

One flight, three answers.

Where are we?

The orthomosaic shows current site conditions at a measurable scale.

How much moved?

The surface model is the baseline for cut/fill and stockpile volumes on the next flight.

Who needs to know?

The report packages it for OAC meetings and owner updates without anyone opening GIS software.

Map your site the same way.

Send the address and what you need to know. You'll get a scope and a flight date back.

Discuss your project →